from €12k
café equipment at economy level, excl. VAT
~€29k
standard pizzeria for 40 seats, excl. VAT
~€66k
standard restaurant for 60 seats, excl. VAT
20,000+
products in one catalogue, one delivery
10 years
maximum ALTUM start-up loan term for equipment (Latvia)
20+
years of experience in HoReCa projects

01Why the first estimate is almost always wrong

The first estimate is usually a list of the big items: oven, fridge, coffee machine, dishwasher. Add them up and you get a reassuringly small number. Then come the “details” — water filter, GN containers, a second fridge, the extraction hood, an electricity upgrade, 300 glasses and 60 chairs. Together these details often cost as much as the big equipment.

That is why this article splits the budget not by brand but by line item — everything you need to welcome guests on day one. Each line has three levels and a link to the relevant YOUR HORECA category with current prices.

How to read the numbers in this article
  • All prices exclude VAT. The tables show the total with Latvian VAT of 21% for reference — in Lithuania it is also 21%, in Estonia 24% and in France 20%. A VAT-registered business recovers it, but it has to be in your cash flow from day one.
  • Economy — equipment you can safely start with while turnover is still unknown. Standard — what we recommend to most new businesses. Premium — higher output, longer service life, branded equipment, design.
  • Each concept includes a 10% contingency for installation, connections and unexpected extras. Experience shows it always gets spent.
  • Fit-out, rent, licences, staff and working capital are not included in these tables — see section 06.

02Café for 30 seats: coffee, pastries, light snacks

In a café the budget revolves around the bar, not the kitchen. The espresso machine and grinder determine product quality and queue speed; the pastry display drives sales. The kitchen is minimal: a convection oven for bake-off croissants and pastries, a panini grill and a sandwich prep station.

Line itemEconomyStandardPremium
Espresso coffee machine
EX2 Mini 1 group → EX2 2 groups 11.5 L → high-end 2–3 groups
€2,339€2,999€5,500
Coffee grinders
1 unit → 2 × “L” (espresso + decaf) → 2 × premium
€365€944€2,398
Water filter, barista tools
A filter is essential — without it the warranty and the machine suffer
€300€600€1,200
Pastry display
Compact → 900–1200 mm refrigerated → design series
€576€2,000€4,500
Refrigerated counter (bar)
2 doors GN 1/1, milk and desserts within arm's reach
€1,679€1,869€2,500
Upright fridge (storage)
600 L → Eco Line 600 L → two-door GN 2/1
€799€1,159€1,479
Ice maker
None → 25 kg/24 h → 50 kg/24 h (iced coffee, lemonades)
—€899€1,289
Blender / juicer
Smoothies, frappés, fresh juices
€150€450€1,500
Convection oven (bake-off)
RXL 304 → 4 × GN STG 71 M → Convotherm maxx 6.10
€719€2,789€5,637
Panini grill, microwave
Sandwiches, quiches, reheating soups
€250€600€1,200
Glass / dish washer
Glasswasher 350 mm → front-loader 500 mm → PRESTIGE 50
€765€1,151€1,959
Stainless tables, sinks, shelves
GREDIL budget series → standard → custom project
€1,200€2,500€5,000
Extraction (if there is an oven)
Portable 2106 → wall hood with E1 fan → custom
€749€1,098€2,500
Cups, plates, glasses, cutlery
With a 30–40% reserve for breakage and rotation
€800€1,800€4,000
Dining furniture for 30 seats
30 chairs (from €29.60) + 10 tables
€1,700€4,200€10,000
Equipment total (excl. VAT)€12,391€25,058€50,662
+ 10% contingency (installation, connections, extras)€1,239€2,506€5,066
Total with contingency, excl. VAT€13,630€27,564€55,728
Incl. VAT 21% (Latvia)€16,492€33,352€67,431

Prices excl. VAT from the catalogue in September 2026; where a line consists of several products or is made to order, the amount is indicative. Prices and availability may change.

Standard café — where €25,058 goes
Dining room and tableware€6,000 · 24%
Bar and coffee€5,892 · 24%
Refrigeration€5,028 · 20%
Stainless furniture and ventilation€3,598 · 14%
Cooking equipment€3,389 · 14%
Warewashing€1,151 · 5%
Our tip for cafés

If the budget is tight, don't skimp on the grinder — save on the number of groups instead. One group with a good grinder will deliver 100–150 cups a day with consistent taste; two groups with a cheap grinder will deliver more, but worse coffee. You can add a second group later by moving to a bigger machine and keep the old one as a backup.

Espresso machines and grinders are in the coffee machine category, water filters and barista tools in bar equipment.

03Pizzeria for 40 seats with takeaway

In a pizzeria everything starts with the oven, and the oven choice sets the budget level. A two-deck electric oven with a stone base costs around €1,300–2,200; a wood-fired Neapolitan oven from €3,100 (compact BABY series) to 15–17 thousand for VERACE models. The difference is not only price: a wood-fired oven needs a flue, fuel storage, an experienced pizzaiolo and a different layout.

Line itemEconomyStandardPremium
Pizza oven
Electric 2 × 4 pizzas → STZ 433 V5 with stone base → wood-fired VERACE 120
€1,339€2,199€14,899
Refrigerated pizza prep table
GP92 → PT1365 with topping display → SFF/712I
€789€1,759€2,639
Spiral dough mixer
20 L / 15 kg → 33 L → 45 L
€990€1,999€2,315
Dough sheeter or press
By hand → sheeter M35A → press PF 33 (Ø 33 cm)
—€849€3,499
Upright fridge
Dough balls, sauces, cheese
€799€1,159€1,479
Freezer
Reserve cheese, frozen dough portions
€700€1,100€1,500
Fryer
10 L → double 10 + 10 L with tap → 10 L professional
€239€759€1,026
Pizza peels, screens, cutters, graters
Perforated peels, turning peel for wood-fired oven
€250€600€1,500
Hood over oven and fryers
GREDIL wall hood → 2000/900 with E3 fan → custom
€529€1,599€3,500
Stainless tables, sinks, shelves
Including a hand-wash sink
€1,500€3,000€6,000
Dishwasher
Front-loader 500 mm → PRESTIGE 50 → hood-type HK 850 E
€1,151€1,959€2,879
Bar area (coffee, drinks cooling)
1 group + grinder → SCHAERER Coffee Club + bar fridge → 2 groups and full cooling
€2,700€4,500€7,000
Pizza bags and delivery boxes
Important if takeaway is 30%+ of turnover
€150€400€1,000
Pizza plates, glasses, cutlery
Pizza plates Ø 31–33 cm
€700€1,500€3,500
Dining furniture for 40 seats
40 chairs + 12 tables
€2,200€5,400€12,800
Equipment total (excl. VAT)€14,036€28,782€65,536
+ 10% contingency (installation, connections, extras)€1,404€2,878€6,554
Total with contingency, excl. VAT€15,440€31,660€72,090
Incl. VAT 21% (Latvia)€18,682€38,309€87,228

Prices excl. VAT from the catalogue in September 2026; where a line consists of several products or is made to order, the amount is indicative. Prices and availability may change.

Standard pizzeria — where €28,782 goes
Dining room and tableware€6,900 · 24%
Stainless furniture and ventilation€4,599 · 16%
Bar and coffee€4,500 · 16%
Refrigeration€4,018 · 14%
Cooking equipment€2,958 · 10%
Dough equipment€2,848 · 10%
Warewashing€1,959 · 7%
Accessories and delivery€1,000 · 3%

Electric vs wood-fired oven — in numbers

ParameterElectric (2 decks)Wood-fired (Neapolitan)
Price excl. VAT in our catalogue€1,339 – €2,199€3,110 – €16,999
Output40–60 pizzas per hourBaking time 60–90 seconds per pizza
Temperatureup to ~450 °C (depending on model)400–500 °C
Extra costsElectrical capacity, extraction hoodFlue, fire safety approvals, firewood
StaffEasy to trainExperience with fire required
When to chooseTakeaway, quick service, first pizzeriaNeapolitan concept, oven as interior centrepiece

Ovens: pizza ovens

04Restaurant for 60 seats with a full kitchen

In a restaurant the kitchen drives most of the budget. The key decision is the combi oven: it replaces several other appliances (steamer, partly the range and grill), but costs as much as several appliances together. The Convotherm maxx 6.10 costs €5,637 in our catalogue; 10-level easyTouch versions from €8,257 to €11,952.

Line itemEconomyStandardPremium
Combi steamer oven
4 × GN convection → Convotherm maxx 6.10 → maxx pro easyTouch 10.10
€2,789€5,637€11,952
Range
4-zone top → 6-zone top → induction line
€1,889€2,369€6,000
Fryer
10 + 10 L → 10 L professional → two tanks with filtration
€759€1,026€2,500
Grill / griddle
Contact grill → 800 mm griddle → lava stone grill
€800€1,800€4,000
Blast chiller
None → AT-3 2/3 → 5–10 GN 1/1
—€2,849€5,500
Upright fridges × 2
Meat/fish separate from vegetables and ready food
€1,598€2,318€2,958
Refrigerated counters × 2
2 doors × 2 → 2 + 3 doors → premium with drawers
€3,358€3,818€5,500
Freezer
Upright or counter freezer
€800€1,200€2,000
Cold room
None → modular cold room → custom project with shelving
—€4,500€9,000
Food preparation machines
Blender, veg cutter, slicer, vacuum packer, scales
€1,200€3,500€8,000
Dishwasher + glasswasher
Manual hood + glasswasher → HK 850 E + front-loader → ES series + glasswasher
€2,815€4,030€6,508
Hoods and make-up air
Catalogue model → system with make-up air → custom with Z-HASP
€1,599€4,500€9,000
Stainless furniture, sinks, pass-through
All zones: prep, hot, cold, warewashing
€3,000€6,000€12,000
Bar (espresso, grinder, ice, cooling)
1 group → 2 groups + ice → full bar station
€4,500€7,500€14,000
Pots, pans, GN containers, knives, boards
Plan 2 sets per shift
€1,500€3,000€6,000
Tableware for 60 seats
3 × seat count for plates and glasses
€1,800€4,000€9,000
Dining furniture for 60 seats
60 chairs + 20 tables
€3,400€8,400€22,200
Equipment total (excl. VAT)€31,807€66,447€136,118
+ 10% contingency (installation, connections, extras)€3,181€6,645€13,612
Total with contingency, excl. VAT€34,988€73,092€149,730
Incl. VAT 21% (Latvia)€42,335€88,441€181,173

Prices excl. VAT from the catalogue in September 2026; where a line consists of several products or is made to order, the amount is indicative. Prices and availability may change.

Standard restaurant — where €66,447 goes
Refrigeration€14,685 · 22%
Dining room and tableware€12,400 · 19%
Cooking equipment€10,832 · 16%
Stainless furniture and ventilation€10,500 · 16%
Bar and coffee€7,500 · 11%
Warewashing€4,030 · 6%
Food preparation machines€3,500 · 5%
Kitchen utensils€3,000 · 5%
Where restaurant budgets most often blow up
  • Extraction and make-up air. Make-up air is the first thing cut from the project, and then the hood works at half capacity. See our steam hood category and ask us for an airflow calculation.
  • Electrical capacity. A combi oven, induction, dishwasher and blast chiller together easily exceed the existing connection. An upgrade is a separate project with its own timeline.
  • Cold room. One upright fridge won't be enough for a 60-seat restaurant — either two or three fridges or a cold room. The cold room must be planned with the premises, not afterwards.
  • The second set. GN containers, pans and boards should be bought so that one set is in the dishwasher and the other in use.

05Three concepts side by side

ConceptEconomyStandardPremium
Café, 30 seats€13,630€27,564€55,728
Pizzeria, 40 seats€15,440€31,660€72,090
Restaurant, 60 seats€34,988€73,092€149,730

Equipment + 10% contingency, excl. VAT. Per seat at standard level: café ~€919, pizzeria ~€792, restaurant ~€1,218.

The “per seat” figure is a quick sanity check for your estimate. Even at economy level, restaurant equipment costs about €583 per seat. If your estimate is much lower, something is probably missing — usually extraction, refrigeration or tableware.

06Equipment is only part of the total opening budget

International studies of restaurant opening costs typically put equipment and smallwares at around a fifth of the total budget. One of the broadest reviews (a survey of 350+ independent restaurants) gives this split:

Typical opening budget split (full-service restaurant)
Fit-out and renovation30%
Kitchen equipment and smallwares22%
Working capital (3–6 months)18%
Lease deposit and first payments12%
Permits, design, approvals10%
IT, marketing, consultants8%

Proportions vary by country — fit-out and rent in the Baltics are often cheaper than in Western Europe, while equipment prices are similar. The practical takeaway: if you have set aside 40 thousand for equipment, the whole project budget must be considerably larger and must include working capital for at least three months. It is the lack of it, not expensive equipment, that most often stops a new business in its first year.

07Costs most often forgotten in the estimate

Line itemWhy it mattersIndicative
Water filters for coffee machine and dishwasherWithout a filter, limescale destroys the boiler and heating elements; some manufacturers void the warranty€150–600
Professional chemicals for the first monthDishwasher, oven, coffee machine, grill€150–400
Electrical and water connectionsEach appliance needs its own socket, drain and water supplyper site
Extraction and make-up airMandatory over cooking equipment; annual cleaning with a certificatefrom €529
GN containers, lids, racksFor storage, bain-maries, ovens — you always need more€300–1,500
Thermometers, scales, HACCP logsThe basis of any food safety inspection€100–400
WorkwearFor cooks, bartenders, waiters€30–80 per person
Tableware losses in year oneBreakage and “disappearance” — 15–30% of the initial setplan a reserve

You will find most of these items in the kitchen accessories, professional chemicals and serving accessories categories — and they are cheaper to order together with the equipment in one delivery.

08Where you can save and where you must not

You can save onYou must not save on
Stainless steel furniture. The GREDIL budget series is AISI 304, HACCP-compliant and costs considerably less than custom furniture.Refrigeration. A cheap fridge that can't hold +3 °C in summer is a direct risk at inspection and in product losses.
Dining furniture. Metal bistro chairs from €29.60 look good and last for years.Dishwasher. It runs all day; a cheap machine with a long cycle means more crockery and more staff.
Equipment whose need is unproven. An ice maker, juicer or blast chiller can be rented or bought in a second phase.Grinder and water filter. They shape coffee taste more than the machine price.
Used equipment. Checked, with a service history — especially ovens and mixers.Extraction. It is a fire safety matter, not comfort.

We sell used equipment in a separate category. Before buying, ask our specialists about the condition, history and spare-parts availability of the specific unit.

09How to finance: buy, rent or borrow

Equipment rental

We rent out fryers, grills, induction hobs, ovens, dishwashers, refrigerated counters, ice makers, coffee machines (including SCHAERER) and bain-maries. Equipment is checked by our service team before delivery, and we can help with connection if needed. Rental makes sense for a seasonal terrace, events and equipment whose need has not yet been proven.

Loans and leasing

National development institutions offer start-up loans and guarantees: ALTUM in Latvia, INVEGA in Lithuania, EIS in Estonia, Bpifrance in France. As an example, the Latvian ALTUM start-up loan (for companies registered no more than 7 years ago) offers:

  • a loan of up to €250,000;
  • up to 10 years for equipment, up to 3 years for working capital;
  • a fixed interest rate from 4.9%;
  • at least 10% own contribution for investment projects.
What this means in practice

A standard restaurant equipment package (€73,092 excl. VAT) with a 10% own contribution and a 10-year loan at 4.9% means a monthly payment of roughly €695. That is less than the monthly cost of one employee — and worth comparing with the income the equipment allows you to generate.

The calculation is illustrative, not a financial offer. Check current terms with the relevant institution or ask your bank about leasing.

10How we help build a budget that doesn't change mid-project

Most budget surprises happen when equipment is chosen separately from the premises: the oven doesn't fit through the door, the fridge has no room to ventilate, the dishwasher has no drain. So we work from the other end — premises and workflow first, then equipment.

1
Consultation and concept
We clarify the menu, seat count, expected turnover and budget ceiling. From this we derive which equipment is essential and which can wait.
2
Kitchen design and workflow
Professional kitchen design: zoning, equipment layout, electrical, water and extraction loads. Changes on paper cost nothing.
3
Personalised estimate at three levels
A line-by-line estimate — just like in this article, but with your room dimensions and exact models. You can see where the economy option is enough and where it will cost more in the long run.
4
Custom solutions
Counters, bar stations, stainless furniture and hoods made to measure — projects and custom solutions: cafés, restaurants, pastry shops, fast food.
5
Delivery and installation
One delivery from our warehouse in Riga; delivery across the Baltics and Europe — terms via contacts.
6
Service and spare parts
12-month warranty on professional equipment, service and spare parts — heating elements, thermostats, gaskets, pumps, fans. Customer service 24/7.

11All categories in one place

Save this list — it is an equipment checklist for any food service concept.

12Frequently asked questions

How much does it cost to equip a small café?
At economy level, equipment and smallwares for a 30-seat café come to about €13,630 excl. VAT (including the 10% contingency), at standard level about €27,564. A very small takeaway coffee point with no seating and no oven can manage with less than half of the economy option.
Do the prices include VAT?
No. All prices exclude VAT. The last row of each concept table shows the total with Latvian VAT of 21%; in Lithuania the rate is 21%, in Estonia 24% and in France 20%.
What to buy first if money is tight?
Everything that ensures food safety and the core product: refrigeration, the main cooking appliance (oven or coffee machine), the dishwasher and extraction. An ice maker, juicer, blast chiller and design displays can be added in a second phase or rented.
Is used equipment a safe option?
Yes, if it has been checked by a service team and spare parts are available. The best candidates are mechanically simple, durable appliances — ovens, mixers, stainless furniture. Be careful with used refrigeration without a known history.
Electric or wood-fired pizza oven — which pays back faster?
Electric: it costs from €1,339 to €2,199, needs no flue, and staff can be trained in a few days. A wood-fired oven (from €3,110) pays back in a concept where Neapolitan pizza is the main product and the oven is part of the experience.
Can you prepare an estimate for my project?
Yes. Send us the floor plan, seat count and menu concept — we will prepare a personalised offer with equipment at three levels, layout and utility loads.
How long does it take to equip a café or restaurant?
In-stock equipment can be delivered quickly — your manager confirms the exact date. For custom stainless furniture and hoods, allow 3–6 weeks after drawing approval, so it is worth starting the project during construction.
How to finance the equipment?
The three most common routes: own funds, equipment rental, and a loan or leasing. National development institutions (ALTUM, INVEGA, EIS, Bpifrance) offer start-up loans and guarantees. Compare several offers before deciding — this article is not financial advice.

Let us build your budget line by line

Tell us about your concept, seat count and premises — we will prepare an estimate at three levels so you can see where investment pays off and where you can start simpler.

Customer service 24/7 · [email protected] · Vagonu iela 23, Riga, Latvia

Prices are taken from the catalogue in September 2026 and exclude VAT; they may change. Lines consisting of several products or made to order are indicative. Opening budget split — based on the RestOps survey of independent restaurants; ALTUM terms — altum.lv, September 2026. This article is for information only and does not replace an individual estimate or financial advice.